Innovation in Production
Engineering Excellence
Management and Games Area
Administration
Open Spaces
Location
Energy Innovation and Environmental Sustainability
Since our founding in 1981, we have grown and evolved to adapt to new technological challenges and the demands of our customers. We have recently expanded our facilities and committed to reducing our carbon footprint by 90%, through the installation of solar panels and a high-capacity battery.
We have also introduced solar chargers for electric vehicles, making us an energy self-sufficient company and a leader in sustainable technologies. These actions reflect our firm commitment to the environment and position us as pioneers in adopting responsible and efficient business practices.
Discover the full potential of our self-sufficient building:
Innovation in Production

In our facilities, production is a carefully optimised process to guarantee maximum efficiency and quality at every step. We have a fully computerised warehouse of 930 m2, where we manage all our materials efficiently.
We also have an air-conditioned panel assembly room of 730 m2, equipped with changing rooms, a canteen and 2 technical offices.
Finally, our 1,150 m2 machine shop is fully equipped for manufacturing our own machine designs, such as the eSAP (isolated power system), eco-friendly structure pile-driving machines, and all the metalwork required for our installations.
How are materials managed and quality ensured in the facilities?
What capabilities does the machine shop have in the facilities?
All 1,100 m2 of our first floor is devoted to the engineering department, which covers areas such as Energy, Processes and Programming. In this large and versatile space, a multidisciplinary team of more than 25 electrical, mechanical, electronic and computer engineers works in an environment that encourages collaboration and the exchange of ideas. We have also added rest areas and advanced technological resources to boost creativity and efficiency in every project.
How is the space on the first floor laid out and what functions does it house?
What measures have been put in place to encourage creativity and efficiency in the engineering team's work?
Engineering Excellence

Management and Games Area

The second floor houses our management offices, a large 220 m2 boardroom, a canteen, restrooms and general archives, with a total area of 415 m2. Our recreation area stands out in particular, with a large terrace where you can enjoy the open-air views and relax while playing a game of mini-golf or table football.
What facilities and areas are on the second floor of the premises described?
What are the notable features of the recreation area in the premises mentioned?
For administration and purchasing, we have open-plan offices and an entrance hall with reception on the ground floor, covering an area of 380 m2. Everything is designed to promote the highest quality in human relationships and efficiency in management.
Question: What facilities on the ground floor are devoted to administration and purchasing in the premises described?
What is the main purpose of the design of the administration and purchasing facilities on the ground floor?
Administration
Location and Open Spaces
Our modern facilities are located at calle Corominas nº12-14 in the Villarrobledo Industrial Estate, on a total area of 13,000 m2. We have 100 parking spaces with wooden structures and photovoltaic roofs, as well as 23 spaces for heavy vehicles. These open spaces not only offer comfort for our employees and visitors, but also reflect our commitment to sustainability and innovation.
We invite you to visit our facilities and see first-hand our dedication to excellence and innovation in every aspect of our work!

